On Site construction has begun for "Job Site", at BCA center, Burlington City arts

Bill Ferehawk, my collaborator , arrived late Tuesday evening. We completed documenting works on Wednesday, loaded the car and by Thursday we were at Burlington City Arts. For two days we constructed the framed walls assembly;lage that will incorporate two video projections. With the help of my husband, Danny Sagan, and with an extra hand from BCA staff, we lifted the walls into place. Monday , June 17th, we resume our installation process and will be hanging the “Studfinder Drawings” as well as prepping the wall for the Frottage drawings of tools. Below some images of the Tool Drawings framed and a few process images.